CHRISTOPHER ANDREWS ARCHITECT & TOWN PLANNER

 

A NEW HEART FOR CHANNAHON ILLINOIS 

PART IV: INCREMENTAL DEVELOPMENT

 

 

a simulation of the process of incremental GROWTH  

Each increment of development will be guided by visions for the future formulated by the community and consulting professionals, based on a dynamic understanding of the existing conditions.  The initial stages of development will establish access to the Village Center site from the surrounding areas and lay out the heart of the Village Center, the Village Green.  The first buildings will be sited on the Green and in clusters at the intersections of these access roads.  A potential scenario of incremental growth and development is shown in the following five frames.

Frame 1

a) The Village Green connects Central Park and the I & M Canal. Local access to the site is provided at Tryon, Willard, Navajo, and Liberty.  The integrated network of vegetation and drainage is initially implemented along these new access streets and the Village Green.

b) The existing alignment for Bluff Road will continue north through the Village Center site to connect with Navajo Street.

c) Main Street is laid out perpendicular to the midpoint of the Highway 6 frontage. A local access frontage road is built parallel to Route 6.  At a later stage the alignment and signal for Bluff Road will be shifted to  the intersection of Highway 6 and Main Street.

d) Saint Ann’s church complex forms a center at the heart of the Village Green.  A Children’s Daycare facility is built at the north side of this block. 

e) A bank and shopping arcade building anchor the corners at the intersection of the Main Street and the Village Green.  A Village Meeting Hall is built on the north edge of Village Green, terminating the view down Main Street. 

f) Agricultural use of the site will continue on unimproved land.  The base of this farming will be at the intersection of the Willard through road and the road parallel to and immediately North of the Village Green.

g) Smaller residential development will begin to cluster around the continuation of the Willard Road alignment. 

h) Senior Housing is built at the east end of the road parallel to and immediately North of the Village Green.

 

Frame 2:   Frame 3:  

a) A Movie Theater on the Frontage Road.

b) Multiple family Town Houses

c) Churches fronting onto the Village Green

d) A small Traveler’s Inn on the Village Green  

 

a) Bluff Road is realigned to intersect with Main Street at Route 6.  A new Post Office is built.  The existing Post Office site is converted into a street which provides direct access to the older commercial district.

b) A Library at the west end of the Village Green

c) A Health Clinic behind the Village Hall  

 

Frame 4:   Frame 5:  

a) Further development of neighborhood clusters and provision of additional local access streets  

 

a)  A Cultural Center and Museum  

 

 